(615) 815-7698 ★★★★★ 5.0 · 113 Google reviews admin@sbcnashville.com
Two-tier pressure-treated deck with a pergola built by Southern Belle Construction on a two-story Tennessee home

07 · Decks

Decks engineered to last through thirty Tennessee summers

Deck builder in Nashville and Middle Tennessee — new wood and composite decks, multi-level decks, deck replacements and pergolas, engineered, permitted and built by a licensed, insured crew.

Nine of our Google reviews mention a deck replacement, and they say the same things: the crew showed up, the site was clean, the estimate held. A deck is structure first — footings below frost, a ledger flashed properly, joists sized for the span, railing that meets code — and only then a beautiful surface. We build both parts to the same standard, in pressure-treated pine, cedar or composite.

  • Multi-level and wrap-around decks
  • Rooftop and elevated decks with dry space below
  • Hidden fasteners and picture-frame borders
  • Deck lighting in posts, stairs and rails
  • Pergolas and shade structures
  • Deck-to-screened-porch conversions

How much does a deck cost in Nashville?

Installed, a pressure-treated deck in the Nashville area typically runs $35 to $55 per square foot and a composite deck $60 to $100 per square foot, with railing, stairs, height and site access moving the number. A 16-by-20 composite deck with aluminum railing most often lands between $25,000 and $40,000. Composite costs more up front and saves the staining every other year.

“They do what they say they will do and show up when they tell you they will.”

Composite or wood?

Composite for a deck you want to forget about: no staining, no splinters, twenty-five-year fade and stain warranties from the major brands. Wood for the lowest first cost and a natural look, with the understanding it needs sealing every two to three years in our climate. Either way the frame underneath is pressure-treated lumber sized to code.

Do I need a permit to build a deck?

In nearly every case, yes — a deck attached to the house, more than thirty inches off the ground or serving an exit door requires a permit and inspections in Metro Nashville and the surrounding counties. Footing, framing and final inspections are all part of our process; we do not order materials until the permit is issued.

How long does it take to build a deck?

One to three weeks on site for most decks once the permit is in hand, longer for multi-level decks, pergolas or a screened room on top. Composite and railing systems are ordered ahead so the crew never waits on materials.

The work

Decks we have built

Full portfolio
Wrap-around front porch with composite decking, white columns and rocking chairs on a Tennessee home
Front porch in composite decking
Elevated screened porch with a new pressure-treated deck and stairs under construction
Screened porch over a new deck
Gray composite deck with black aluminum railing and a cantilever umbrella
Composite deck with shade umbrella
White pergola over a new composite deck on a two-story white farmhouse
White pergola over a composite deck

Answers

Decks: the questions people ask

Something else on your mind? Ask us or call (615) 815-7698.

Do you replace old decks?

Yes — deck replacement is the single most common project in our Google reviews. We remove the old structure, reuse footings only if they meet current code, and rebuild with a flashed ledger, treated framing and the surface and railing you choose.

What is the best decking material for Tennessee weather?

Composite. Middle Tennessee’s humidity, summer sun and freeze-thaw winters are hard on wood; capped composite boards from Trex, TimberTech and similar brands resist fading, staining and rot and carry twenty-five-year warranties. Pressure-treated pine remains the value choice if you are willing to seal it.

Can you build a deck on a sloped yard?

Yes. Sloped lots are where decks make the most sense: engineered footings, taller posts with bracing, and multi-level designs that step down the grade. A screened room on the upper level and dry storage below are common additions.

How long does a deck last?

A properly built composite deck lasts twenty-five to thirty years or more; a pressure-treated deck fifteen to twenty with regular sealing. The frame is what fails first on cheap decks, which is why ours are built with code-sized joists, flashed ledgers and corrosion-resistant hardware.

Can you turn my deck into a screened porch?

Often, yes. If the framing and footings can carry a roof — or can be reinforced to — we add posts, a roof tied into the house, a screen system and a ceiling. It is the most affordable way to gain a true outdoor room.

Free estimate

Tell us about the house you have and the one you want.

A conversation, a site visit and a written estimate — free, unhurried and without obligation. We answer within one business day.

We reply within one business day, usually the same day. No obligation, and we never sell your information.

Free estimate

Tell us about the house you have and the one you want.

A conversation, a site visit and a written estimate — free, unhurried and without obligation. We answer within one business day.

Call Free Estimate